I have been meaning to do a few jobs in the green houses so i thought i would have a go today. My first job was to do a slight repair to the roof of the 10ft green house with the help from my son. For some reason 2 of the top panes of glass in the roof had dropped about 3" and the rain was coming in so that was a job that had to be done. It only took about an hour so it was not a hard job.
The next job to be done was to adjust the door but found that it needs new wheels which i will order tomorrow. Now the one thing that i do most years is to light a sulphur candle and kill any nasties that are lying or hiding away but i make sure that there is nothing in the green house such as plants. Now that it is ready i will light the candle on sunday night and all should be clear by monday morning.
As i have said i have got everything ready for the toms but i did add strengthening bars to the top of the support cane to make it more secure.
Now in the 4-6" green house ware i do all my sowing and potting , i have got rid of a lot of bits and pieces that i really do not need and when you do this it is surprising how much room you have found.
After completing the above job i had a good check on all that was growing and everything looks ok.
I have been told by the boss (wife) that she would like me to grow some beet root, so it off to shop tomorrow for seeds. That is all for now trill later on.
No comments:
Post a Comment